Bassendean: overhead power converted to underground
The overhead power supply to a Bassendean home converted to underground: new three phase consumer mains from the Western Power dome, trenched across the front yard and run up to the switchboard.
What the customer needed
The home in Bassendean was supplied by an overhead line. The owners wanted it converted to an underground supply from a new Western Power dome at the front of the site.
Site constraints
The cable had to pass under a timber sleeper retaining wall and across the front lawn and garden bed, then up the outside wall and through the roof to the switchboard on the porch, which meant lifting roof sheets. The changeover also had to be coordinated with Western Power on the day.
What we did
We installed new 16mm² three phase consumer mains underground, about 32 metres in all, from the new Western Power dome at the front left corner of the site to the switchboard on the porch. We pre-laid two conduits under the sleeper retaining wall, trenched about 15 metres across the front of the property through the lawn and garden bed, and laid warning tape over the cable. From there the mains run up a steel riser on the external cladding and through the roof to the switchboard. We upgraded the main switch to a 32A three phase circuit breaker, and arranged the Western Power disconnection and reconnection. The job took two visits: one to pre-lay the cable, and one to attend the changeover with Western Power. The owners organised the Western Power dome separately.
The result
No more overhead line to the house: a neat underground supply from the dome to the switchboard, with the Western Power changeover handled.