Case study

Palmyra: old three phase fuse board replaced with a new RCD-protected switchboard

An old three phase switchboard with ceramic fuses and an asbestos backing panel, replaced with a new compliant board with RCD protection on every circuit.

What the customer needed

The client had had enough of their old three phase switchboard, with ceramic fuses that couldn’t simply be reset.

Site constraints

The old switchboard had an asbestos backing panel, which had to be removed.

What we did

We removed the old switchboard and its asbestos backing panel, and installed a new compliant three phase switchboard. Every ceramic fuse was replaced with an RCD-protected circuit breaker, so all final sub-circuits now have safety switch protection. The new board has a three phase main switch, and RCD protection to one three phase breaker, four 16A circuits, one 10A circuit and a 32A three phase circuit, with every circuit clearly labelled.

The result

A safe, modern, clearly labelled switchboard with safety switch protection on every circuit, and no more fuses to deal with.

An old three phase switchboard in Palmyra with ceramic fuses for the lights, power and stove, on a black asbestos backing panel.
Before: the old fuse board on an asbestos backing panel.
The new three phase switchboard in Palmyra, with a three phase main switch, RCDs and labelled Clipsal circuit breakers.
After: a new board with RCD protection on every circuit, all labelled.

Getting a quote starts with a few simple details.

Tell us what you need and upload a few photos. Our Perth team will review your enquiry and help you take the next step.

What to expect when you book us

  1. Tell us what you need

    Choose your service and answer a few straightforward questions.

  2. Add a few photos

    Show us the equipment, location or work required so we can understand the job.

  3. We review your enquiry

    Our team checks the details and sends you a price upfront, or contacts you if more information or a site visit is needed.

Call Book Get a price